What does the workflow look like in practice?
Konštrukčné komponenty VST
- Pracovný postup: 1. Vykladanie

1. Unloading

VST walls are unloaded from a truck using a crane.

Konštrukčné komponenty VST
- Pracovný postup: 2. Presun na stavenisko

2. Transfer to the construction site

VST walls are transported to the construction site and placed near the installation site.

Konštrukčné komponenty VST
- Pracovný postup: 3. Príprava podložiek

3. Preparation of pads

Preparation and leveling of pads for VST walls.

Konštrukčné komponenty VST
- Pracovný postup: 4. Tesnenie

4. Sealing

Application of sealing tape to the bottom edges of VST walls.

Konštrukčné komponenty VST
- Pracovný postup: 5. Umiestnenie

5. Placement

VST walls are placed on the prepared pads.

Konštrukčné komponenty VST
- Pracovný postup: 6. Zarovnanie

6. Alignment

Vertical and horizontal alignment of VST walls.

Konštrukčné komponenty VST
- Pracovný postup: 7. Spevnenie rohov

7. Corner bracing

Installation of bracing on open corners.

Konštrukčné komponenty VST
- Pracovný postup: 8. Spevnenie spojov

8. Joint reinforcement

Installation of vinyl strips to close corners.

Konštrukčné komponenty VST
- Pracovný postup: 9. Príprava VST stropu

9. Preparation of VST ceiling

Preparation of the ceiling for the installation of the load-bearing panels.

Konštrukčné komponenty VST
- Pracovný postup: 10. Inštalácia stropných panelov

10. Installation of ceiling panels

Placement of ceiling panels into position.

Konštrukčné komponenty VST
- Pracovný postup: 11. Inštalácie v strope

11. Installations in the ceiling

Installation of wiring and other elements in the ceiling.

Konštrukčné komponenty VST
- Pracovný postup: 12. Armovanie stropu

12. Ceiling reinforcement

Ceiling reinforcement and preparation for concreting.

Konštrukčné komponenty VST
- Pracovný postup: 13. Dokončenie inštalácií

13. Completion of Installations

Completion of all installations in the ceiling.

Konštrukčné komponenty VST
- Pracovný postup: 14. Inštalácia prefabrikátov

14. Precast Installation

Placement of precast concrete VST elements.

Konštrukčné komponenty VST
- Pracovný postup: 15. Betónovanie

15. Concreting

Concreting walls using a concrete basket or concrete pump.

Konštrukčné komponenty VST
- Pracovný postup: 16. Dokončenie betonáže

16. Completion of concreting

Concreting of ceilings.

Konštrukčné komponenty VST
- Pracovný postup: 17. Minimalizácia presunov

17. Minimization of transfers

Most of the construction materials are placed in the future rooms before the ceiling is placed and concreted (windows, doors, sanitary fittings, plasterboards, etc.).

1. Unloading

VST walls are unloaded from a truck using a crane.

2. Transfer to the construction site

VST walls are transported to the construction site and placed near the installation site.

3. Preparation of pads

Preparation and leveling of pads for VST walls.

4. Sealing

Application of sealing tape to the bottom edges of VST walls.

5. Placement

VST walls are placed on the prepared pads.

6. Alignment

Vertical and horizontal alignment of VST walls.

7. Corner bracing

Installation of bracing on open corners.

8. Joint reinforcement

Installation of vinyl strips to close corners.

9. Preparation of VST ceiling

Preparation of the ceiling for the installation of the load-bearing panels.

10. Installation of ceiling panels

Placing the VST ceiling panels in position.

11. Installations in the ceiling

Installation of wiring and other elements in the ceiling.

12. Ceiling reinforcement

Ceiling reinforcement and preparation for concreting.

13. Completion of Installations

Completion of all installations in the ceiling.

14. Joint forming

Use of patented joint forms.

15. Concreting of walls

Concreting of walls using a concrete pump.

16. Installation of precast concrete

Placement of precast concrete VST elements.

17. Completion of concreting

Concreting of ceilings with self-compacting concrete.

18. Facade scaffolding

Installation of scaffolding for façade works.

19. Installation of window frames

Installation of steel brackets for windows.

20. Finishing

Finishing of rooms with minimal finishing work.

Illustrative video
Construction of a VST project in Berlin

Contact us

If you are interested in VST technology or have additional questions, do not hesitate to contact us. Just fill out and submit the form below and our sales representative will contact you.






    By submitting the form, your personal data is processed for contact purposes. More information on the Privacy Policy page

    bubblemenu-circlecross-circle linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram